{"id":949,"date":"2025-03-18T15:04:42","date_gmt":"2025-03-18T14:04:42","guid":{"rendered":"https:\/\/osebergvikingarv.no\/eng\/?p=949"},"modified":"2025-03-18T15:04:44","modified_gmt":"2025-03-18T14:04:44","slug":"new-construction-project-at-midgard","status":"publish","type":"post","link":"https:\/\/osebergvikingarv.no\/eng\/2025\/03\/18\/new-construction-project-at-midgard\/","title":{"rendered":"New Construction Project at Midgard"},"content":{"rendered":"\n<p><strong>Oseberg Viking Heritage has won yet another contract for the Midgard Viking Center in<br>Borre. This time, a loft will be built in the Gildehall.<\/strong><br><em>By Einar Chr. Erlingsen<\/em><\/p>\n\n\n\n<p>OVA is the general contractor for the construction project, which involves installing a loft on<br>both sides of the hall along its length. The loft will be built at the height of the top of the<br>walls, approximately three meters high.<\/p>\n\n\n\n<p><br>According to construction manager Jan Vogt Knutsen, the purpose of adding a loft is to<br>improve the lighting in the hall so that the lamps are no longer visible. Spotlights will be<br>recessed, and floodlights will be installed above the loft to create more indirect lighting.<br>Additionally, the color of the lighting can be adjusted to create special atmospheres. The<br>project will also accommodate the placement of sound equipment.<\/p>\n\n\n\n<p><br>For OVA, the assignment includes not only project management but also the construction of<br>the loft itself, which will be hand-planed underneath to avoid machine marks. The same<br>applies to the large supporting beams.<\/p>\n\n\n\n<p><br>Work is set to begin around March 1st and is expected to continue until just before Easter.<br>Some of OVA\u2019s boatbuilders will continue working on\u00a0Saga Gokstad\u00a0at the shipyard in<br>T\u00f8nsberg, as will our department in Sandefjord.<\/p>\n\n\n\n<p><br><em>Translated from Norwegian by ChatGPT.<\/em><\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-dfb7eddc wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" srcset=\"https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-01-HS.jpeg ,https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-01-HS.jpeg 780w, https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-01-HS.jpeg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-01-HS.jpeg\" alt=\"\" class=\"uag-image-950\" width=\"427\" height=\"640\" title=\"Midgard 01 HS\" loading=\"lazy\" role=\"img\"\/><\/figure><\/div>\n\n\n\n<p class=\"has-text-align-center\">MAJOR PROJECT:\u00a0Our construction manager Jan Vogt Knutsen and his team are<br>undertaking an extensive project in the Gildehall at the Midgard Viking Center. A loft will be<br>built along both sides of the hall. (Photo: H\u00e5vard Soler\u00f8d).<\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-a5ad682f wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" srcset=\"https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-02-HS.jpeg ,https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-02-HS.jpeg 780w, https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-02-HS.jpeg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-02-HS.jpeg\" alt=\"\" class=\"uag-image-951\" width=\"640\" height=\"427\" title=\"Midgard 02 HS\" loading=\"lazy\" role=\"img\"\/><\/figure><\/div>\n\n\n\n<p class=\"has-text-align-center\">HALL BUILDERS:\u00a0Most of our craftsmen have taken a break from shipbuilding to work on<br>the Gildehall in Borre instead. The work is expected to be completed around Easter. (Photo:<br>H\u00e5vard Soler\u00f8d).<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Oseberg Viking Heritage has won yet another contract for the Midgard Viking Center inBorre. This time, a loft will be built in the Gildehall.By Einar Chr. Erlingsen OVA is the&hellip; <\/p>\n","protected":false},"author":3,"featured_media":951,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_uag_custom_page_level_css":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-949","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"aioseo_notices":[],"uagb_featured_image_src":{"full":["https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-02-HS.jpeg",640,427,false],"thumbnail":["https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-02-HS-150x150.jpeg",150,150,true],"medium":["https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-02-HS-300x200.jpeg",300,200,true],"medium_large":["https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-02-HS.jpeg",640,427,false],"large":["https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-02-HS.jpeg",640,427,false],"1536x1536":["https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-02-HS.jpeg",640,427,false],"2048x2048":["https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-02-HS.jpeg",640,427,false],"gg_gallery_thumbnail":["https:\/\/osebergvikingarv.no\/eng\/wp-content\/uploads\/sites\/2\/2025\/03\/Midgard-02-HS-450x250.jpeg",450,250,true]},"uagb_author_info":{"display_name":"elin","author_link":"https:\/\/osebergvikingarv.no\/eng\/author\/elin\/"},"uagb_comment_info":0,"uagb_excerpt":"Oseberg Viking Heritage has won yet another contract for the Midgard Viking Center inBorre. This time, a loft will be built in the Gildehall.By Einar Chr. Erlingsen OVA is the&hellip;","_links":{"self":[{"href":"https:\/\/osebergvikingarv.no\/eng\/wp-json\/wp\/v2\/posts\/949","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/osebergvikingarv.no\/eng\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/osebergvikingarv.no\/eng\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/osebergvikingarv.no\/eng\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/osebergvikingarv.no\/eng\/wp-json\/wp\/v2\/comments?post=949"}],"version-history":[{"count":1,"href":"https:\/\/osebergvikingarv.no\/eng\/wp-json\/wp\/v2\/posts\/949\/revisions"}],"predecessor-version":[{"id":952,"href":"https:\/\/osebergvikingarv.no\/eng\/wp-json\/wp\/v2\/posts\/949\/revisions\/952"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/osebergvikingarv.no\/eng\/wp-json\/wp\/v2\/media\/951"}],"wp:attachment":[{"href":"https:\/\/osebergvikingarv.no\/eng\/wp-json\/wp\/v2\/media?parent=949"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/osebergvikingarv.no\/eng\/wp-json\/wp\/v2\/categories?post=949"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/osebergvikingarv.no\/eng\/wp-json\/wp\/v2\/tags?post=949"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}